Various: 4.3 hours

Added fiberglass lenght to bottom empennage gap fairings. 

Cut out stainless firewall foil for engine mount.

Final sanded canopy frame. Began sanding empennage fairing.


Engine mount & canopy: 4.8 hours

Home made drill bushings to match drill 3/16 pilot holes. Rigid tube OD reduced .005 with a cordless drill and a file. 

Had to use a jack to get proper top mount hole spacing. 

Drilled firewall for engine mount 3/8 bolts.

I think it’s good!?

Added epoxy to canopy frame bulkheads to fill pinholes.