Elevators finished: 6.0 hours

Replaced marginal rivets on horizontal stab. Installed elevator horn nutplates for addition of balance weight later on. Then installed elevators and drilled elevator horns. Everything fit and bolted together nicely.
I then pressed on and match drilled, dimpled, and edge prepped the elevator skin and tips.
IMAG0946
IMAG0945