Connected fuel lines to fuel valve. Deburred, scuffed, and dimpled seat ramp assemblies.
Monthly Archives: July 2016
Floors, battery tray, and seat support: 6.7 hours
Seat floors: 6.6 hours
Match drilled stiffeners and rear seat hinge to seat floors. Countersunk seat rib flanges. Scuffed and dimpled floors, foot wells, and deburred rib flanges.
Seat floors: 5.0 hours
Gear brackets and floors: 6.2 hours
Vent lines: 3.0 hoursĀ
Brake lines: 5.1 hours
Tank vent lines: 2.8 hours
Finished deburring landing gear brackets.
Began fabricating vent lines after several hours of contemplating how exactly I’m gonna approach this.
JDAIR vents
Tank vents & cooling ramp: 6.5 hours
Installed JDair tank vents. Not much room as I had to drill a hole in the forward floor for the pass through. I have 2D on the brake line hole with the forward edge of the vent just inboard of the cover edge. They look awesome and I think I can hook these up with a quick connector that’s used for pitot static lines.
Began deburring landing gear mount holes.
Installed stainless cooling ramp, nice and shiny.