Rib flange tool

Spent some free time making this tool to expedite flange straightening!
Thanks to Jason at RV-7 Factory for the informative post! http://www.rv7-factory.com/?cat=5&paged=4
IMAG0969

Advertisements

Tips finished-empennage complete: 2.1 hours

Two days work 5/6-5/7/14.

Applied microfiller to tip cap and second layer to rudder counter weight. Final sanded contour and riveted tip cap to vertical stab. Final sanded rudder counter weight micro.
Total build time=253.8 hours
IMAG0967