Bellcranks: 2.7 hours

Two days work 3/5-3/6/15.
Trimmed left and right bellcrank brass bushings to correct length. Fabricated left and right pushrod spacers.

image
Fabricated left and right aileron hinge spacers.
image

Advertisements