Continued wih lay up on left side of canopy. Sanded edges of previous layups. Just realized I was shorted a couple yards from AS. So as soon as I get the rest in I can finish the last layup.
Monthly Archives: September 2017
Canopy fiberglass: 3.6 hours
Canaopy: 1.8 hours
Canopy: 2.2 hours
Canopy bonding: 2.0 hours
Canopy frame: 5.1 hours
Painting: 4.0 hours
Canopy frame painting: 2.5 hours
Seat back support: 1.0 hours
Empennage fairings 1.1 hours
Finished match drilling empennage and gap fairings. Drilled and tapped longerons for 6-32 screws.