Vertical Stab work: 2.5 hours

Disassembled all parts, edge finished, deburred, scuffed, and dimpled skin.

Advertisements

Finished riveting the horizontal stab: 7.0 hours

Shot of right HS-707 before it was closed in.

Image

Set all of the flush rivets in the skin. I only had to drill out two that were over driven.

Now I need to find a Tech Inspector to sign off my work then I can rivet in the rear spar to complete my first assembly!

Image