Left flap prep: 1.0 hours

Managed to squeeze in an hour and finished rib edge prep, deburr, and scuff.

Advertisements

Flap prep: 5.2 hours

Finished right flap edge prep and skin dimpling. Primed right flap skin, spar, and ribs. Drilled left flap brackets to rib spar. Began deburring left flap skins.
Edge prepped left aileron brackets.

image