Canopy: 2.8 hours

Sanded aft edge of frame and added additional micro to cover air pockets. Sanded flox flange smooth. Fabricated 3/16 bushings as an engine mount hole guide.

Advertisements

Canopy: 3.1 hours

Added more micro to flange and top of canopy frame.

Added miro to aft edge of frame to fill in gaps. 

Sanded canopy flange edge for bonding later. Just about ready to prime and paint. Began drilling firewall for engine mount.

Canopy: 4.0 hours

Sanded flox flange then added and sanded micro to aft side of flange. 

Drilled 1/4″ holes with unibit on canopy. All holes drilled with regular #30 well used bit,  no cracking issues at all. Outside temp around 85-90 degrees.