Cowling: 5.1 hours

Match drilled upper cowl to skybolt flanges. Some mood lighting for construction pleasure. Backlight helped to locate flange center.

Installed grommets and studs. Sanded lower cowling upper edge flat. Marked split lines on upper cowling.

Cowling

Got to looking at my upper left engine mount and the Barry mount was not as compressed as the right. Turns out that I accidentally put the long bolt in the top. -43 top and -44 bottom.

So got those swapped out then had to realign the cowl and redraw the cut lines. Got the cowl aft side rough cut. Added two remaining top flange rivets.

Not enough time to log.