Horizontal Stabilizer Front Spar Assembly: 3.9 hours

Match drilled and dimpled required holes.

Made the 6 degree bends in the spar and reinforcement angles.

Tapered and countersunk spar reinforcement angles.Image

 

Advertisements

Practice kit

Practice kit complete! Lost of mistakes and a lot learned.

I was not able to attend the last EAA builders class due to a schedule conflict. With the help of VAF forum, EAA builder videos, CAT instructional videos, GeoBeck, and RV builder basics I was able to gain some great insight. I have an Airframe and Powerplant license but haven’t been involved with the maintenance side since 1993.

Image

Empennage is on the way!