Wing wiring: 4.7 hours

Installed ground blocks to instrument sub panel. Not an ideal location as they will be under the avionics shelf. Space is limited so as usual it’s a compromise.

Installed right wing root pins and connectors.

Advertisements

Wing wiring: 2.2 hours

Secured GTP tempature probe wiring with zip ties.

Had to reroute wiring at last four inboard ribs to clear pushrods. That took a while. Trimmed wires and pitot tubing. Decided to install wing root connectors to allow for completing as much wiring as possible at the house.