Right leading edge and tank prep: 4.5 hours

Two days work 11/20-11/21/14.
Drilled right leading edge for tie down ring and tapped tie down bar.
tmp_30791-20141120_152557-269628370
Installed left and right anti-rotation brackets. Torqued all fuel tank fittings. Deburred right leading edge ribs and skin.
tmp_30791-20141121_203042957252069

Advertisements