SB complete & horizontal stabilizer mounting: 8.9 hours

Finished SB 14-01-31. Took me about 22 hours total so now I should be good to go.

After leveling fuselage longitudinally and horizontally I centered the stab on the aft deck and checked for level then match drilled the stabilizer bars to the aft spar. 

 Then I aligned and clamped the stab laterally at 101 3/8 inches both sides to mark drill holes on forward spar reinforcement. 

 